Skip to content

Emergency contacts आपत्‌कालीन सम्पर्क

All emergency information सबै आपत्‌कालीन जानकारी
Verified Source Rescue

Kathmandu, September 2 The road connecting to the Kerung border point linking to

English

Kathmandu, September 2 The road connecting to the Kerung border point linking to Rasuwagadhi has fully resumed operation as of Wednesday morning, 10 AM, according to China.

From Onlinekhabar English

Kathmandu, September 2 The road connecting to the Kerung border point linking to Rasuwagadhi has fully resumed operation as of Wednesday morning, 10 AM, according to China. Chinese media reports say this will allow rescue workers, relief supplies, equipment, and heavy machinery to reach the main disaster-affected areas by road, enabling more extensive rescue operations. Road-clearing efforts have now reached the core disaster zone, where search and rescue work is underway through coordination across multiple methods. According to CCTV footage, the final stretch of road that had been blocked by water has been temporarily reopened, allowing heavy machinery to pass through as well. Heavy machinery clearing the national highway near the main disaster-affected area of the Kerung border has now reached close to the main building at the Chinese-side Kerung border facility. The post China opens road to Kerung border, allowing heavy rescue equipment into affected areas appeared first on OnlineKhabar English News.

Where this came from This information was collected automatically from the original source and summarised. It is not a copy of the original and it may leave things out. Please read the original for the complete information.

You have read a short extract. The full report is published by Onlinekhabar English.

यो संक्षिप्त अंश मात्र हो। पूरा समाचार मूल स्रोतमा पढ्नुहोस्।

Read Original →

Source
Onlinekhabar English
Source type
Verified Source
Platform
Website
Originally published
2 September 2026, 7:21 AM
Collected
2 Sep 2026, 7:21 AM
Locations mentioned
rasuwa, rasuwagadhi

← All Rasuwa updates