Nepali Army Helicopter
English
Nepali Army Helicopter. Nuwakot, September 1 Search and rescue operations are continuing across Rasuwa and Nuwakot following the devastating Bhotekoshi flood on August 26, with security forces, Nepal Electricity Authority personnel and tech…
From Onlinekhabar English
Nepali Army Helicopter. Nuwakot, September 1 Search and rescue operations are continuing across Rasuwa and Nuwakot following the devastating Bhotekoshi flood on August 26, with security forces, Nepal Electricity Authority personnel and technical teams from friendly countries deployed at multiple locations. The District Administration Office, Nuwakot, released an updated account on Tuesday outlining the progress of search, rescue, road clearance and relief operations. Search continues at hydropower projects At the Upper Trishuli-3A Hydropower Project, around 90 personnel from the Nepal Army, Armed Police Force and Nepal Electricity Authority are involved in the search. After locating the tunnel head, teams drilled through around 10 metres of mud and created an opening into the inlet. However, a large volume of water began flowing through the opening, prompting teams to drill at another location. At Trishuli-3B, 47 personnel have been deployed. An excavator was airlifted to the site, with 18 helicopter flights conducted so far. At Upper Trishuli-1, foreign technical experts are working under the leadership and coordination of the Nepal Army.
You have read a short extract. The full report is published by Onlinekhabar English.
यो संक्षिप्त अंश मात्र हो। पूरा समाचार मूल स्रोतमा पढ्नुहोस्।
- Source
- Onlinekhabar English
- Source type
- Verified Source
- Platform
- Website
- Originally published
- 1 September 2026, 1:16 PM
- Collected
- 1 Sep 2026, 1:17 PM
- Locations mentioned
- rasuwa, dhunche, langtang, haku, chilime, bhorle, trishuli, bhotekoshi