Skip to content

Emergency contacts आपत्‌कालीन सम्पर्क

All emergency information सबै आपत्‌कालीन जानकारी
Verified Source Flood

Bailey bridge being built over the Tadi River

English

Bailey bridge being built over the Tadi River. Kathmandu, September 6 The installation of a Bailey bridge over the Tadi River at Devighat Bazaar in Nuwakot began on Saturday, with the Nepal Army starting the construction work.

From Onlinekhabar English

Bailey bridge being built over the Tadi River. Kathmandu, September 6 The installation of a Bailey bridge over the Tadi River at Devighat Bazaar in Nuwakot began on Saturday, with the Nepal Army starting the construction work. The bridge will reconnect Devighat Bazaar with Jiling, which have remained disconnected after a permanent bridge was swept away by a massive flood in the Bhotekoshi River in Rasuwa on August 26. The flood caused extensive damage to bridges and other infrastructure along the Bhotekoshi and Trishuli rivers, with around 100 bridges reportedly damaged. Once completed, the Bailey bridge will provide a temporary transport link between Devighat Bazaar and Jiling and help ease movement in the flood-affected areas. The post Bailey bridge installation begins over Tadi River in Nuwakot appeared first on OnlineKhabar English News.

Where this came from This information was collected automatically from the original source and summarised. It is not a copy of the original and it may leave things out. Please read the original for the complete information.

You have read a short extract. The full report is published by Onlinekhabar English.

यो संक्षिप्त अंश मात्र हो। पूरा समाचार मूल स्रोतमा पढ्नुहोस्।

Read Original →

Source
Onlinekhabar English
Source type
Verified Source
Platform
Website
Originally published
6 September 2026, 11:53 AM
Collected
6 Sep 2026, 11:56 AM
Locations mentioned
rasuwa, trishuli, bhotekoshi

← All Rasuwa updates