Skip to content

Emergency contacts आपत्‌कालीन सम्पर्क

All emergency information सबै आपत्‌कालीन जानकारी
Verified Source Flood

Rasuwa, September 17 The bodies of five employees who were trapped at the Chilim

English

Rasuwa, September 17 The bodies of five employees who were trapped at the Chilime Hydropower Station have been handed over to their respective families.

From Onlinekhabar English

Rasuwa, September 17 The bodies of five employees who were trapped at the Chilime Hydropower Station have been handed over to their respective families. Chilime Hydropower Company Managing Director Baburaja Maharjan said the bodies of engineer Santosh Pandey, electrical supervisor Minraj Moktan, security guards Shyam Bahadur Thapa Magar and Tilak Bahadur Thapa Magar, and Nepal Electricity Authority employee Lakpa Tamang were identified and handed over to their families. They were found dead on Wednesday in the control room area, located about 150 metres inside the tunnel from its outer section. They had been trapped at the power station after flooding in the Bhotekoshi River. According to Maharjan, the bodies found inside the power station were transported to Nuwakot by a Nepal Army helicopter before being handed over to their families. The post Bodies of five Chilime Hydropower employees handed over to families appeared first on OnlineKhabar English News.

Where this came from This information was collected automatically from the original source and summarised. It is not a copy of the original and it may leave things out. Please read the original for the complete information.

You have read a short extract. The full report is published by Onlinekhabar English.

यो संक्षिप्त अंश मात्र हो। पूरा समाचार मूल स्रोतमा पढ्नुहोस्।

Read Original →

Source
Onlinekhabar English
Source type
Verified Source
Platform
Website
Originally published
17 September 2026, 8:45 AM
Collected
17 Sep 2026, 8:58 AM
Locations mentioned
rasuwa, chilime, bhotekoshi

← All Rasuwa updates